Project Plan Engineering (IX7102)
Download IX7102 descriptor
IX7102 Aims
- IX7102-AI: Specify and develop the critical skills to design assurance of project execution with allocated resources.
- IX7102-A2: Specify and develop the critical skills to organize conditions for project execution.
- IX7102-A3: Specify and develop the critical skills to define effective communication for project development and control.
IX7102 Learning Outcomes
- IX7102-LO1: Review and analyse tools to engineer conformance of the project at the tactical level of project manager.
- IX7102-LO2: Critically analyse, design and organize process to construct project baseline plan and performance measurement plan for the project.
- IX7102-LO3: Evaluate communication for tactical control by project manager.
IX7102 Module Content
- IX7102-C1: Project feasibility
- Methodology for project feasibility analysed through case study: hospital renovation.
- Critical project feasibility review: communication and interpretation.
- IX7102-C2: Project logic
- Professional practices for project logic analysed through case study: Ariane 4 flight campaigns.
- Analysis of relationships between work packages and intermediate deliverables. Diagramming methods.
- Presentations, labs and preparation of independent study of project baseline logic.
- IX7102-C3: Project organisation
- Construction process of Role Table (Responsibility Assignment Matrix) and OBS (Organisation Breakdown Structure).
- Critical review of analytical estimates for activities and work packages.
- Presentations, labs and preparation of independent study of project analytical estimates.
- IX7102-C4: Project structure
- Construction process of WBS (Work Breakdown Structure) for budget assignment, visibility and coordination: professional practices.
- Critical review of work package description in project baseline plan.
- Presentations, labs and preparation of independent study of project baseline structure.
- IX7102-C5: Project schedule
- Construction process for project schedule using dedicated project scheduling software tools.
- Critical analysis of finish dates integration at data date to determine management action needed.
- Presentations, labs and preparation of independent study of project baseline schedule.
- IX7102-C6: Activity performance analysis
- Critical analysis of time and cost performance for an activity versus technical metrics.
- Presentations, labs and preparation of independent study of activity performance measurement.
- Methodology to relate various metrics during project execution: case study.
- IX7102-C7: Project performance analysis
- Professional practices for periodic consolidation of performance status for all activities.
- Critical analysis of deviations.
- Quality control to validate performance status: methodologies and critical review of quality standards.
- Presentations, labs and preparation of independent study of project performance measurement plan.
- IX7102-C8: Project scope management
- Critical analysis of proposals for updated project plan: methodologies to reflect impact of a change request in the definition of the deliverable.
- Presentations and labs.
|
|